Layout Construction: part 3. Complete track plan rework.

The initial track plan did not work out. The custom made turnouts that were supposed to go in didn’t prove reliable. Accordingly I decided to simplify things so I went with Walters shinohara #4s dcc ready ones. The plan itself was changed completely as well now being a simpler run through station in a small town outskirts with one industrial siding.

The turnout controls I went with are bullfrogs from Fast Tracks. At 6$ a kit the price is right and they work really smooth and reliably. The kit takes about 20 minutes to assemble. However these things are really strong and put a fair bit of pressure onto the turnout. Accordingly I had to secure all the track work with Gorilla Strength glue.

The running quality of the little decauville however remains below acceptable and something remains to be done.
20120112-150723.jpg

This is basically how the state of affairs looks like on the layout. Next I need to finalize the track work and start burrying it all in groundwork.

Until next time

Thanks for looking

Advertisement

~ by thenarrowgaugeshops on January 10, 2012.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Connecting to %s

 
Follow

Get every new post delivered to your Inbox.